For project managers and buyers
On a data center, speed to market comes first.
Every bolted connection in the frame is inspected under the Statement of Special Inspections. Those special inspections must never be what slips.
Schedule certainty
Daily field reports go out the same day, and every bolted connection has a current status as the steel goes up. No surprises before the turnover date.
No costly delays or rework
A deficiency reaches the erector the same day, while the bolt-up gang is still on the steel. Corrective action can start before the crew moves on.
Code compliance, closed out
Bolting Inspection assists with every task the special inspector is required to perform. Each item on the Statement of Special Inspections is documented, and the Final Report of Special Inspections is ready at closeout.
More from your special inspectors
The daily field report is built and signed on site. Hours spent writing reports go back to inspecting, so the same team covers more call-outs.
Reports that stand up
The report carries enhanced visual evidence for every item, whether it passes or has a deficiency. That goes beyond what is required.
Owner, developer or general contractor? Ask your testing agency to run the pilot on your next steel package.
Schedule certainty →Special inspection agency? Give your clients this schedule story, with the special inspectors you have.
A shift in a minute →What it covers
Everything the special inspector is required to do.
Every required task, through to the signed report
Bolting Inspection assists the special inspector with the whole job: the inspection tasks before bolting, during bolting and after bolting, each deficiency and its corrective action, and the daily field report.
Enhanced visual evidence for every item
The report carries visual evidence for the items that pass as well as for the deficiencies. That goes beyond what is required, and it is there when a question comes up later.
Walk the site
Start at the schedule board. End at the site trailer.
Speed to market starts with the steel.
Steel that is inspected and closed out, with no surprises before the turnover date.
Same special inspectors. Same shift.
More bolted connections inspected and closed out.
Put your team on the board.
See what the pilot targets would return to you.
Point the phone at the bolted connection.
It checks every bolt. Your special inspector calls the deficiency and signs.
Signed before the inspector leaves the site.
Every project, every report, every open deficiency. Without a site visit.
One steel package. Your report format.
Run it beside your current process for one week, at no charge.
What stays with your agency
Your special inspector makes every finding and signs.
- The special inspector decides. The AI checks what the camera sees and drafts the record. Every finding and every signature is the inspector’s.
- Pretension comes from the method. The special inspector verifies the installation method on the steel. Bolting Inspection does not measure bolt pretension from an image.
- Open until seen. When it cannot see enough, it says so and asks for another view. That check stays open.
- Your scope and your format stay. The Statement of Special Inspections stays as it is, and reports go out in your own format.
- Targets are labeled as targets. No pilot has been measured yet, so every figure about the product is a pilot target.
TurboProc
More throughput from the team you have.
TurboProc Bolting Inspection
For special inspection agencies. Special inspections that keep pace with the steel. Pilot program.
TurboProc Bolt-up Copilot
For steel erectors. Get it right before the special inspector arrives. Pilot program.
TurboProc Scope
Running a production line? TurboProc Scope finds the lost time, step by step. On the App Store.
One steel package. Your report format.
Run Bolting Inspection beside your current process for one week, with one special inspector, at no charge.
Apply for the pilot →