05 The plan table
The daily field report is signed before the inspector leaves the site.
No evening of paperwork. The report is built during the shift from what the special inspector saw and said, in your own format, ready to sign.
Reports out the same day
- Built on site. Each bolted connection adds its lines and photos to the daily field report as the shift goes on.
- Your format. The report comes out in your own template, as PDF and as data.
- Enhanced visual evidence. The report carries visual evidence for every item, the ones that pass and the deficiencies. That goes beyond what is required.
- Signed by your special inspector. Nothing goes out unsigned.
- Sent where your reports go today. The engineer of record, the general contractor and the building official, on your distribution.
- Deficiencies do not wait for the report. Each one reaches the erector at once, with the photo, so corrective action can start the same day.
The manager’s view
Every project, every report, every open deficiency. Without a site visit.
You see the work as it stands today, not as it stood when the last report came in.
- Daily field reports out. Which went out today, and which are still open.
- Open deficiencies. What is waiting on corrective action, and for how long.
- Hours per steel package. Where your special inspectors’ time is going.
- Closeout. The Final Report of Special Inspections builds from the same record.
Your systems
It feeds the reporting you already have.
Keep your digital forms. Reports come out in your own template as PDF and data. Connections to agency reporting systems and to contractors’ project platforms are planned. None is claimed until it is built.
Figures are pilot targets, not measured results. The special inspector makes every finding and signs. Screens shown are an illustrative simulation.