01 The schedule board

Speed to market starts with steel that is inspected and closed out.

Every bolted connection in the frame is inspected under the Statement of Special Inspections. TurboProc Bolting Inspection helps the special inspection agency keep those special inspections in step with the steel, so nothing is waiting on a report at closeout.

A site schedule board by the fence with a look-ahead schedule pinned up, the steel frame behind it.
The schedule board, beside the gateIllustration

What the project sees

No surprises at closeout.

Reports the same day

The daily field report is signed on site and goes out before the special inspector leaves.

Status by bolted connection

A current status for every bolted connection, area by area, as the steel goes up.

Deficiencies that move

A deficiency reaches the erector the day it is found, with the photo. Corrective action starts while the bolt-up gang is still on the steel.

A final report that builds

The Final Report of Special Inspections builds from the same record, so bolting is not an item on the punch list.

Bolting Inspection does not make steel go up faster. It removes the ways special inspections can hold a project up. It states no schedule days saved, because no pilot has been measured yet.

What is at stake

A month matters.

One month of delayAs much as $14.2 million

On a typical 60 MW data center in the United States, by one consultancy’s estimate.

STL Partners, March 2025
The top prioritySpeed to market

Ranked first among priorities in designing a data-center project, in a survey of 401 industry leaders.

Turner & Townsend, November 2026
Skilled labor81% say it is constrained

The share of respondents who say skilled labor in their region is constrained.

Turner & Townsend, cost index 2026-27

These are published industry estimates, not TurboProc results. In these reports the leading causes of data-center delay are power availability and supply chains, not special inspections. When a month is worth this much, special inspections must never be what slips.

Code compliance, closed out

Do not risk a stop-work order over a missing report.

Bolting Inspection helps the special inspection agency meet code compliance. It does not replace the agency, the engineer of record or the building official.

  • Every item, documented. Each item on the Statement of Special Inspections is tracked per bolted connection.
  • Visual evidence for every item. Items that pass and deficiencies alike. Each deficiency cites the detail and the drawing revision.
  • The Final Report of Special Inspections, ready at closeout. It builds from the same record as the daily field reports.
  • The same approved agency. It performs the same required special inspections and reports in its own format.

The building code gives the building official authority to stop work and requires a final report of special inspections (2024 International Building Code, Sections 115 and 1704.2.4, in paraphrase). Local requirements vary. Confirm them with your building official and your engineer of record.

Start with one steel package

One week. One special inspector. No charge.

Owners, developers and general contractors

Tell us which special inspection agency and which steel erector are on your next steel package. With your consent, we invite the agency to run the pilot.

Ask your testing agency to run the pilot →

Special inspection agencies

This is the schedule story your clients are buying. Run the pilot beside your current process, in your own report format.

Apply for the pilot →

The pilot runs beside the agency’s current process. The required special inspections do not change.

Figures are pilot targets, not measured results. The special inspector makes every finding and signs. Delay and labor figures are published industry estimates from STL Partners and Turner & Townsend, not TurboProc results.